Fulgor Milano Built In Freezer - F7SFC30S1-L

Model#: F7SFC30S1-L

$11,739.00 $13,339.00

Overview:

Fulgor Milano F7SFC30S1-L Built In Freezer, 30 inch Width, 12.67 cu. ft. Capacity, Frost Free, Interior Light (Freezer), Ice Maker, Stainless Steel colour Left Hand Swing

Buy More Save More
NOW FOR A LIMITED TIME, buy 2 or more eligible major kitchen/laundry appliances from separate categories and save instantly!

BUY 2 ITEMS, GET $150 OFF!
BUY 3 ITEMS, GET $400 OFF!
BUY 4 ITEMS, GET $700 OFF!
BUY 5 ITEMS, GET $800 OFF!
BUY 6 OR MORE ITEMS, GET $1,000 OFF!

Automatically applied during checkout or call 1-877-374-3439 to redeem this offer today!

PRICE GUARANTEE: Buy now with 60 days price protection.

Ratings & Reviews:

Literature

Reserve & Pick Up from Showroom »

Distribution Centres Address Units Available
Brampton 280 Rutherford Road S, In stock
Etobicoke Etobicoke In stock
Mississauga Mississauga In stock
Springdale Springdale In stock

Protect your purchase with an extended warranty.
  • 1 Yr EXT Major Appliance - 12 months : $399.99
  • 2 Yr EXT Major Appliance - 24 months : $684.99
  • 3 Yr EXT Major Appliance - 36 months : $824.99
  • 4 Yr EXT Major Appliance - 48 months : $1,054.99

Fulgor Milano F7IFC30O1-L Built-In Freezer Column: Elegance and Functionality Combined
Introducing the Fulgor Milano F7IFC30O1-L Built-In Freezer Column, a stunning blend of elegance, performance, and advanced technology. This 30-inch freezer column offers a generous 12.67 cu. ft. capacity, making it an ideal addition to your modern kitchen.

Elegant Design:
Crafted with an elegant 304 stainless steel cladded door and matching pro handle, this freezer column seamlessly integrates with Fulgor Milano's stainless cooking products. The brilliant white aluminum interior, accented with brushed aluminum and stainless steel, adds a touch of sophistication to your kitchen.

Superior Food Preservation:
Designed to preserve the organoleptic qualities of your ingredients, this freezer combines elegant design with commercial-grade performance. A dedicated compressor and evaporator ensure consistent and precise temperatures throughout, keeping your food fresh and preserved.

Versatile Storage:
With 12.67 cu. ft. of storage space, this freezer includes two height-adjustable shelves, three drawers, and two height-adjustable door bins. The top of the ice maker serves as an additional shelf, providing ample room for all your frozen goods.

Convenient Features:

Total No Frost: Automated defrosting ensures your food remains fresh without the hassle of manual defrosting.
LED Lighting: Multilevel LED lighting enhances visibility, making it easy to locate items quickly.
Ice Maker: Located in the upper section, the ice maker produces up to 2.2 lbs of ice using purified water from the integrated filtering system.
Integrated Installation: The 100° opening flush hinge allows for a seamless, truly integrated installation.
Additional Features: Enjoy deep-freezing capabilities, Holiday Mode, Sabbath Mode, height-adjustable glass shelves, and a professional handle kit for added convenience and style.
Fulgor Milano Quality:
Inspired by Italian design and craftsmanship, Fulgor Milano appliances enrich your living spaces with a passion for quality and contemporary aesthetics. The stainless steel exterior and luminous white interior of this freezer embody the brand's commitment to excellence.

Manufacturer's Warranty:
Backed by a 2-year manufacturer's warranty, the Fulgor Milano F7IFC30O1-L Built-In Freezer Column ensures reliable performance and peace of mind.

Available at Teletime:
Experience the perfect combination of form and function with the Fulgor Milano F7IFC30O1-L Built-In Freezer Column. Transform your kitchen with this elegant, high-performance appliance designed to meet all your frozen storage needs, available exclusively at Teletime.

Certifications
Certification None
Dimensions
Depth 25 Inch
Height 83 1/2 Inch
Width 30 Inch
Depth without Handles 25"
Minimum niche height 84 1/2"
Additional Specs
Finish Stainless Steel Exterior
Key Features
Fingerprint Resistant No
Capacity
Total Capacity (cu. ft.) 12.67 Cu. Ft.
Interior capacity (cbft) 12.67
Ice Maker production capacity 2.2 lbs / 24 hrs
General
Interior Light Yes
Annual Energy 548 kWh/yr
Watts 327 W
Model F7SFC30S1L
Accepts Custom Panels No
Column Yes
Connection
Volts 115 Volts
Sabbath Mode Yes
DIMENSIONS/CLEARANCES/WEIGHTS
Net Weight 368 lbs
Exterior Details
Cabinet Finish Stainless Steel
Details
Approved for Commercial Use No
Approved for Medical Use No
Approved for Outdoor Use No
Freezer Details
Number of Drawers 3
Freezer Drawers 3
General Specs
Total Number of Shelves 2
Remote Monitoring No
Fridge Features
Shelves Glass
Cooling Feature
No Frost Yes
Smart
WiFi Embedded No
Smart Accessory Required No
Smart Home / App Compatible No
Basic Spec
Hinge Side Left
Feature
Ice Maker Yes
No. of Shelves 2
Defrost Type Frost-Free
Glass Door No
Lock No
Adjustable Door Shelves 2
Electrical requirements
Hz 60 Hz
Exterior Appearence
Undercounter No
design
Color Stainless Steel
Overview
Size Full Size
LIGHTING
LED Lighting Yes
POWER / RATINGS
Amps 3 A
DOOR
Door clearance 52"
Door opening angle 100°
Other
Ada Compliant No
Accessory
Power Cable Nema 5-15P
Cooktop Details
Series 700 Series
Specifications
Energy Star Qualified No
Microphone
Type Built In

Ratings Distribution

5 star
0
4 star
0
3 star
0
2 star
0
1 star
0
Reviewed by 0 customers

Protect your purchase with an extended warranty.

  • Protect your purchase for 12 months: $399.99 CAD
  • Protect your purchase for 24 months: $684.99 CAD
  • Protect your purchase for 36 months: $824.99 CAD
  • Protect your purchase for 48 months: $1,054.99 CAD
$3,913.00 per month
$0 interest
$133.39 financing fee
$1,956.50 per month
$0 interest
$333.48 financing fee
$978.25 per month
$0 interest
$533.56 financing fee
$652.17 per month
$0 interest
$800.34 financing fee
$489.13 per month
$0 interest
$1,067.12 financing fee

Fridge Installations:

  • If a whole new waterline is necessary, it is recommended that this service be obtained.
  • When our delivery crew arrives, they will uncrate and transfer your new refrigerator into position if it is intended to replace the refrigerator you already have. It will not be plugged in by them.
  • In the event that there is access to the floor from the ground, the installation will comprise sixty feet of waterline.

The packing will not be removed by our installer, nor will they offer carry away services. Reversing the door of the refrigerator is a service that may be provided for an additional fee.

Gas Range Installations:

  • Please note that this bundle does not include any packing removal services.
  • Unfortunately, haul away is not included in this service.
  • Additional fees will be assessed if shut-off valves, gas permits, or any other kind of special carpentry work is required in order to accommodate the new appliance.
  • If a totally new installation is required, please get in touch with us and decide for an on- site estimate. Immediately after the conclusion of the on-site inspection, our installer will offer a comprehensive estimate of the work that is necessary as well as the cost that is related with it. Each and every price associated with an on-site inspection is non- refundable and must be paid for at the TELETIME store in your immediate vicinity. Including all necessary plumbing and electrical work, as well as any other trades and permissions that are needed to support the completion of the new installation, this encompasses everything essential.

Gas Dryer with Flexible Hose Installation:

  • The purchase of this service is recommended if there was a gas dryer already installed in the premises.
  • If a totally new installation is required, get in touch with us and make arrangements for an on-site estimate. Immediately after the conclusion of the on-site inspection, our installer will offer a comprehensive estimate of the work that is necessary as well as the cost that is related with it. Each and every price associated with an on-site inspection is non-refundable and must be paid for at the Teletime store in your immediate vicinity.
  • The packing will not be removed by our installer, nor will they offer carry away services.
  • If any shut-off valves, gas permits, vent-less exhaust kits, conversion kits, vent hose, stacking of goods, expansion and reduction adapters, or special carpentry work is required in order to accommodate the new appliance, additional fees will be incurred.

White Glove Dryer Installation (only works with electric dryers):

  • The delivery person will finish this task when they arrive to deliver the package.
  • At the place of purchase, there will be additional fees that apply.

Washing Machines with White Glove Service:

  • The delivery person will finish this task when they arrive to deliver the package.
  • At the place of purchase, there will be additional fees that apply.

Dishwashers with Hoses and Haul Away Service

  • The packing will be removed off the device, and our installer will pick it up and bring it to you.
  • A simple installation into an already existing outlet is shown here.
  • Included in this installation service is a braided fill hose made of stainless steel that is six feet long and serves as the supply line.
  • The old unit will be removed by our installer, who will also dispose of all the packaging and other materials.
  • Any risers, air gaps, pigtails, elbows, on/off switches, working in crawl spaces, or special carpentry work that is required to remove the previous unit may result in additional expenses being incurred.
  • If a totally new installation is required, please get in touch with us and make arrangements for an on-site estimate. Immediately after the conclusion of the on-site inspection, our installer will offer a comprehensive estimate of the work that is necessary as well as the cost that is related with it.

Dishwashers with Hoses

  • A simple installation into an already existing outlet is shown here.
  • Before beginning the installation, you are required to remove the packing.
  • If you have not ordered delivery via our installer, your unit need to be positioned near the location where it is going to be installed before our delivery workers arrive.
  • Kindly detach the unit that you currently have.
  • Included in this installation service is a braided fill hose made of stainless steel that is six feet long and serves as the supply line.
  • If the removal of the previous unit requires the use of any risers, air gaps, pigtails, elbows, on/off switches, working in crawl spaces, or special carpentry work, additional fees will be incurred.

Ductless Range Hoods Installation

  • This service does not involve the removal of packing materials or the disposal of packaging.
  • If a totally new installation is required, please get in touch with us and decide for an on- site estimate. Immediately after the conclusion of the on-site inspection, our installer will offer a comprehensive estimate of the work that is necessary as well as the cost that is related with it. Each price associated with an on-site inspection is non-refundable and must be paid for at the TELETIME store in your immediate vicinity. Including all necessary plumbing and electrical work, as well as any other trades and permissions that are needed to support the completion of the new installation, this encompasses everything essential.

Ducted Range Hoods Installation:

  • This service does not involve the removal of packing materials or the disposal of packaging.
  • If a totally new installation is required, please get in touch with us and make arrangements for an on-site estimate. Immediately after the conclusion of the on-site inspection, our installer will offer a comprehensive estimate of the work that is necessary as well as the cost that is related with it. Each price associated with an on-site inspection is non-refundable and must be paid for at the Teletime store in your immediate vicinity. Including all necessary plumbing and electrical work, as well as any other trades and permissions that are needed to support the completion of the new installation, this encompasses everything essential.

Island Canopy or Vent Installation:

  • There will be no drywall patching or painting included in this package, nor will there be any relocating of the current duct work.
  • This service does not involve the removal of packing materials or the disposal of packaging.
  • If a totally new installation is required, please get in touch with us and make arrangements for an on-site estimate. Immediately after the conclusion of the on-site inspection, our installer will offer a comprehensive estimate of the work that is necessary as well as the cost that is related with it. Each price associated with an on-site inspection is non-refundable and must be paid for at the Teletime store in your immediate vicinity. Including all necessary plumbing and electrical work, as well as any other trades and permissions that are needed to support the completion of the new installation, this encompasses everything essential.

Over the Range Installation:

  • Before installation, remove the unit's packing and do a thorough inspection.
  • Electrical service should be disconnected from the current OTR.
  • Disconnect the Duct
  • Install, center (if at all feasible), and secure the support bracket for the new OTR in accordance with the specifications provided by the manufacturer.
  • The exhaust fan should be checked and rotated, if necessary, in order to ensure that there is enough ventilation.
  • If required, connect and seal to the duct that is already in place.
  • Connect the OTR cable to the receptacle and fasten it with the hardware that is supplied.
  • Put in place all of the racks, panels, coverings, and/or filters that are accessory.
  • The OTR should be tested by turning on and monitoring a heating cell (using a container that is filled with water), the exhaust fan, and all of the lights and accessories that are still present.
  • In the event that the OTR is put inside a ductless installation, the installer will make certain that the auxiliary charcoal filter is fitted correctly.

For your information, all of the accompanying packaging of the device that was installed will be disassembled and stored in a storage facility or outdoors, depending on the circumstances.

Most Frequent Overages:

  • Dedicated electrical line operating at 110 volts.
  • Either converting a circular vent into a rectangular vent or the other way around
  • Putting in place a box for electrical outlets if an incorrect service was offered.
  • The installation of additional ductwork to facilitate the switch from perpetual exhaust to recirculating or vice versa.
  • Working on the carpentry to make room for the new OTR.

Electric Cooktop Installation:

  • Before installing, take out the unit's packing and give it a check.
  • Place the cooktop in the opening.
  • Adjust the leveling brackets to the cabinet floor to ensure that the cooktop is erect.
  • Fasten the cooktop firmly to the counter.
  • Glue leveling brackets to the cabinet's bottom.
  • Insert the proper power cable into the cabinet.
  • Attach the cooktop to the outlet and electrical box.
  • Insert the cooktop power cable into the outlet. Test the cooktop by turning on all of the surface burner elements, all of the controls, and all of the accessories (such as the clock, timer, and setting).

Please take note that all related packaging for the installed equipment will be disassembled and stored outdoors if needed.

Typical Overages

  • Carpentry to make the replacement appliance fit.

Gas Cooktop Installation:

  • Before installing, take out the unit's packing and give it a check.
  • Disconnect the gas from the appliance after turning off the gas supply at the shut-off valve and making sure the gas is off there. If there isn't a shut-off valve, there may be extra costs to turn off the gas and install a shut-off valve, but they can't go above the approved additional fee estimate that the client is given.
  • Fasten the cooktop firmly to the counter.
  • Glue leveling brackets to the cabinet's bottom.
  • Adjust the leveling brackets to the cabinet floor to ensure that the cooktop is erect.
  • Plug the cooktop power cable into an outlet and connect the cooktop to the electrical box and receptacle.
  • Insert the proper power cable into the cabinet.
  • Make sure the line is sealed up and leak-free.
  • Attach the new gas appliance's ventilation and gas service.
  • Restart the gas supply and check for leaks in all the connections.
  • Check for leaks and keep an eye on the gas supply.
  • Make that the appliance has all its accessories installed, including lint filters, burner faps, racks, grease, and trousers.
  • Test the gas appliance by turning on and keeping an eye on all the surface burner elements, controls, and accessories (such as a clock, timer, and setting), as well as all of the ventilation connections (make sure all burner elements are adjusted to exhibit the correct flame characteristics).
  • Includes the new, code-mandated flex hose.

Please take note that all related packaging for the installed equipment will be disassembled and stored outdoors if needed.

Typical Overages

  • Off-the-shelf conversion kits
  • Custom woodworking to make the new item fit.

Wall Oven Installation:

  • Single wall ovens will be installed by a two-person crew.
  • Cut off the electric oven's power supply and unplug the device.
  • Make sure the electrical cable is disconnected to avoid damaging the outlet.
  • Attach the new electric oven's electrical supply.
  • Make that the appliance has all of its attachments (burns caps, racks, trousers, grates, etc.) attached.
  • To test a wall oven, turn it on and keep an eye on all of the burner elements on the outside, the broiler, the oven, OR the inside heating elements, all of the controls, all of the accessories (such as a clock, timer, or setting), the oven door, and the storage drawer.

Please take note that all related packaging for the installed equipment will be disassembled and stored outdoors if needed.

Typical Overages

  • When a new unit is shorter than an old one, shelf build-up.
  • gas to electric conversion OR vice versa (may need local gas supplier and/or electrician)
  • Customer woodworking to make the new appliance fit.

BBQ Installation:

  • Take the device out of the packaging and check that there are no broken or missing parts.
  • Building the Barbecue Installing any add-ons like the side burner, ignitor, etc.
  • After installation, go over appropriate functioning and installation with the client.
  • final cleanup of the construction site

Please take note that all related packaging for the installed equipment will be disassembled and stored outdoors if needed.

Please do not hesitate to get in touch with Teletime if you do not find the service that you seek. One may choose from a broad variety of services, some of which might not be included on the list.

Related Products

Recently Viewed Products