LG ELECTRIC DRYER - DLEX9000V
Model#: DLEX9000V
Overview:
LG DLEX9000V Electric Dryer, 29 inch Width, 9.0 cu. ft. Capacity, Steam Clean, 5 Temperature Settings, Steel Drum, Wifi Enabled, Graphite Steel colour
BUY 2 ITEMS, GET $150 OFF!
BUY 3 ITEMS, GET $400 OFF!
BUY 4 ITEMS, GET $700 OFF!
BUY 5 ITEMS, GET $800 OFF!
BUY 6 OR MORE ITEMS, GET $1,000 OFF!
Automatically applied during checkout or call 1-877-374-3439 to redeem this offer today!
PRICE GUARANTEE: Buy now with 60 days price protection.
Ratings & Reviews:
Literature
Reserve & Pick Up from Showroom »
| Distribution Centres | Address | Units Available |
|---|---|---|
| Brampton | 280 Rutherford Road S, | In stock |
| Etobicoke | Etobicoke | In stock |
| Mississauga | Mississauga | In stock |
| Springdale | Springdale | In stock |
Protect your purchase with an extended warranty.
- 1 Yr EXT Major Appliance - 12 months : $109.99
- 2 Yr EXT Major Appliance - 24 months : $189.99
- 3 Yr EXT Major Appliance - 36 months : $229.99
- 4 Yr EXT Major Appliance - 48 months : $289.99
Introducing the LG DLEX9000V Electric Dryer, a pinnacle of advanced technology and capacity for the modern laundry room. With its expansive 29-inch width and impressive 9.0 cu. ft. capacity, this Graphite Steel dryer is designed to handle large loads effortlessly, including king-size comforters and extensive bedding, streamlining your laundry routine with maximum efficiency.
Experience the power of TurboSteam™ Technology, which revitalizes garments in just 10 minutes, reducing wrinkles and refreshing fabrics faster than conventional steam settings. For those last-minute occasions, the SteamFresh™ Cycle swiftly eliminates wrinkles from up to five items, ensuring you always step out with crisp, ready-to-wear attire.
Control your laundry remotely with ease using the ThinQ® app, allowing you to start or stop cycles, monitor energy usage, and receive notifications directly on your smartphone. Seamless integration with Google Assistant and Amazon Alexa enables intuitive management through simple voice commands, enhancing convenience in your home.
Equipped with the SteamSanitary™ Cycle, the DLEX9000V also sanitizes and refreshes non-washable items, such as decorative pillows, utilizing the power of steam to eliminate bacteria effectively.
The Electronic Control Panel features a sleek design integrated into the door, offering both style and intuitive functionality. LG's Sensor Dry System ensures precise drying by automatically adjusting drying times based on moisture levels, guaranteeing consistently dry laundry with every cycle.
Elevate your laundry experience with the LG DLEX9000V Electric Dryer, exclusively available at Teletime. All Rights Reserved.
| Specifications | |
|---|---|
| Energy Star Qualified | No |
| Microphone | |
| type | Electric |
| Certifications | |
| ThinQ® | Remote Start and Cycle Monitor, Energy Monitoring |
| Warranty | |
| Parts & Labour | 1 Year |
| Capacity | |
| Capacity (cubic feet) | 9.0 cu. ft. |
| Appearance | |
| All Available Colors | Graphite Steel (V) |
| CONTROLS | |
| Control Panel | Plastic |
| Key Features | |
| Product (WxHxD) | 29 |
| Details | |
| Pedestal Options | WDP5V |
| General Specs | |
| Matching Washer | WM9000HVA |
| Touch Buttons | Yes |
| No. of Programs | 14 - Sensor Dry: Cotton/Normal, Perm. Press/Casual, Towels, Delicates, Heavy Duty, SteamFresh™ SteamSanitary™, Bedding, LowTemp Dry, Anti-Bacterial, Jumbo Dry, Download/Super Dry Programs. Manual Dry: Speed Dry, Air Dry |
| design | |
| Design Look | On-Door Front Control Panel |
| General | |
| No. of Temperature Settings | 5 - High, Medium High, Medium, Low, Ultra Low |
| Feature | |
| Manual Dry Times | 60 min., 50 min., 40 min., 30 min., 20 min., More Time/Less Time |
| 3 Minute Installation Check | Yes |
| FlowSense® Duct Clogging Indicator | Yes |
| 4 Adjustable Legs | Yes |
| Dimensions | |
| Weight (Product) | 157.4 lbs |
| Dryer Options | |
| Drum Light | Yes |
| DOOR | |
| Door / Rim | Glass / Chrome |
| MATERIAL & FINISH | |
| NeveRust™ Stainless Steel Drum | Yes |
Reviewed by 0 customers
Protect your purchase with an extended warranty.
- Protect your purchase for 12 months: $109.99 CAD
- Protect your purchase for 24 months: $189.99 CAD
- Protect your purchase for 36 months: $229.99 CAD
- Protect your purchase for 48 months: $289.99 CAD
Fridge Installations:
- If a whole new waterline is necessary, it is recommended that this service be obtained.
- When our delivery crew arrives, they will uncrate and transfer your new refrigerator into position if it is intended to replace the refrigerator you already have. It will not be plugged in by them.
- In the event that there is access to the floor from the ground, the installation will comprise sixty feet of waterline.
The packing will not be removed by our installer, nor will they offer carry away services. Reversing the door of the refrigerator is a service that may be provided for an additional fee.
Gas Range Installations:
- Please note that this bundle does not include any packing removal services.
- Unfortunately, haul away is not included in this service.
- Additional fees will be assessed if shut-off valves, gas permits, or any other kind of special carpentry work is required in order to accommodate the new appliance.
- If a totally new installation is required, please get in touch with us and decide for an on- site estimate. Immediately after the conclusion of the on-site inspection, our installer will offer a comprehensive estimate of the work that is necessary as well as the cost that is related with it. Each and every price associated with an on-site inspection is non- refundable and must be paid for at the TELETIME store in your immediate vicinity. Including all necessary plumbing and electrical work, as well as any other trades and permissions that are needed to support the completion of the new installation, this encompasses everything essential.
Gas Dryer with Flexible Hose Installation:
- The purchase of this service is recommended if there was a gas dryer already installed in the premises.
- If a totally new installation is required, get in touch with us and make arrangements for an on-site estimate. Immediately after the conclusion of the on-site inspection, our installer will offer a comprehensive estimate of the work that is necessary as well as the cost that is related with it. Each and every price associated with an on-site inspection is non-refundable and must be paid for at the Teletime store in your immediate vicinity.
- The packing will not be removed by our installer, nor will they offer carry away services.
- If any shut-off valves, gas permits, vent-less exhaust kits, conversion kits, vent hose, stacking of goods, expansion and reduction adapters, or special carpentry work is required in order to accommodate the new appliance, additional fees will be incurred.
White Glove Dryer Installation (only works with electric dryers):
- The delivery person will finish this task when they arrive to deliver the package.
- At the place of purchase, there will be additional fees that apply.
Washing Machines with White Glove Service:
- The delivery person will finish this task when they arrive to deliver the package.
- At the place of purchase, there will be additional fees that apply.
Dishwashers with Hoses and Haul Away Service
- The packing will be removed off the device, and our installer will pick it up and bring it to you.
- A simple installation into an already existing outlet is shown here.
- Included in this installation service is a braided fill hose made of stainless steel that is six feet long and serves as the supply line.
- The old unit will be removed by our installer, who will also dispose of all the packaging and other materials.
- Any risers, air gaps, pigtails, elbows, on/off switches, working in crawl spaces, or special carpentry work that is required to remove the previous unit may result in additional expenses being incurred.
- If a totally new installation is required, please get in touch with us and make arrangements for an on-site estimate. Immediately after the conclusion of the on-site inspection, our installer will offer a comprehensive estimate of the work that is necessary as well as the cost that is related with it.
Dishwashers with Hoses
- A simple installation into an already existing outlet is shown here.
- Before beginning the installation, you are required to remove the packing.
- If you have not ordered delivery via our installer, your unit need to be positioned near the location where it is going to be installed before our delivery workers arrive.
- Kindly detach the unit that you currently have.
- Included in this installation service is a braided fill hose made of stainless steel that is six feet long and serves as the supply line.
- If the removal of the previous unit requires the use of any risers, air gaps, pigtails, elbows, on/off switches, working in crawl spaces, or special carpentry work, additional fees will be incurred.
Ductless Range Hoods Installation
- This service does not involve the removal of packing materials or the disposal of packaging.
- If a totally new installation is required, please get in touch with us and decide for an on- site estimate. Immediately after the conclusion of the on-site inspection, our installer will offer a comprehensive estimate of the work that is necessary as well as the cost that is related with it. Each price associated with an on-site inspection is non-refundable and must be paid for at the TELETIME store in your immediate vicinity. Including all necessary plumbing and electrical work, as well as any other trades and permissions that are needed to support the completion of the new installation, this encompasses everything essential.
Ducted Range Hoods Installation:
- This service does not involve the removal of packing materials or the disposal of packaging.
- If a totally new installation is required, please get in touch with us and make arrangements for an on-site estimate. Immediately after the conclusion of the on-site inspection, our installer will offer a comprehensive estimate of the work that is necessary as well as the cost that is related with it. Each price associated with an on-site inspection is non-refundable and must be paid for at the Teletime store in your immediate vicinity. Including all necessary plumbing and electrical work, as well as any other trades and permissions that are needed to support the completion of the new installation, this encompasses everything essential.
Island Canopy or Vent Installation:
- There will be no drywall patching or painting included in this package, nor will there be any relocating of the current duct work.
- This service does not involve the removal of packing materials or the disposal of packaging.
- If a totally new installation is required, please get in touch with us and make arrangements for an on-site estimate. Immediately after the conclusion of the on-site inspection, our installer will offer a comprehensive estimate of the work that is necessary as well as the cost that is related with it. Each price associated with an on-site inspection is non-refundable and must be paid for at the Teletime store in your immediate vicinity. Including all necessary plumbing and electrical work, as well as any other trades and permissions that are needed to support the completion of the new installation, this encompasses everything essential.
Over the Range Installation:
- Before installation, remove the unit's packing and do a thorough inspection.
- Electrical service should be disconnected from the current OTR.
- Disconnect the Duct
- Install, center (if at all feasible), and secure the support bracket for the new OTR in accordance with the specifications provided by the manufacturer.
- The exhaust fan should be checked and rotated, if necessary, in order to ensure that there is enough ventilation.
- If required, connect and seal to the duct that is already in place.
- Connect the OTR cable to the receptacle and fasten it with the hardware that is supplied.
- Put in place all of the racks, panels, coverings, and/or filters that are accessory.
- The OTR should be tested by turning on and monitoring a heating cell (using a container that is filled with water), the exhaust fan, and all of the lights and accessories that are still present.
- In the event that the OTR is put inside a ductless installation, the installer will make certain that the auxiliary charcoal filter is fitted correctly.
For your information, all of the accompanying packaging of the device that was installed will be disassembled and stored in a storage facility or outdoors, depending on the circumstances.
Most Frequent Overages:
- Dedicated electrical line operating at 110 volts.
- Either converting a circular vent into a rectangular vent or the other way around
- Putting in place a box for electrical outlets if an incorrect service was offered.
- The installation of additional ductwork to facilitate the switch from perpetual exhaust to recirculating or vice versa.
- Working on the carpentry to make room for the new OTR.
Electric Cooktop Installation:
- Before installing, take out the unit's packing and give it a check.
- Place the cooktop in the opening.
- Adjust the leveling brackets to the cabinet floor to ensure that the cooktop is erect.
- Fasten the cooktop firmly to the counter.
- Glue leveling brackets to the cabinet's bottom.
- Insert the proper power cable into the cabinet.
- Attach the cooktop to the outlet and electrical box.
- Insert the cooktop power cable into the outlet. Test the cooktop by turning on all of the surface burner elements, all of the controls, and all of the accessories (such as the clock, timer, and setting).
Please take note that all related packaging for the installed equipment will be disassembled and stored outdoors if needed.
Typical Overages
- Carpentry to make the replacement appliance fit.
Gas Cooktop Installation:
- Before installing, take out the unit's packing and give it a check.
- Disconnect the gas from the appliance after turning off the gas supply at the shut-off valve and making sure the gas is off there. If there isn't a shut-off valve, there may be extra costs to turn off the gas and install a shut-off valve, but they can't go above the approved additional fee estimate that the client is given.
- Fasten the cooktop firmly to the counter.
- Glue leveling brackets to the cabinet's bottom.
- Adjust the leveling brackets to the cabinet floor to ensure that the cooktop is erect.
- Plug the cooktop power cable into an outlet and connect the cooktop to the electrical box and receptacle.
- Insert the proper power cable into the cabinet.
- Make sure the line is sealed up and leak-free.
- Attach the new gas appliance's ventilation and gas service.
- Restart the gas supply and check for leaks in all the connections.
- Check for leaks and keep an eye on the gas supply.
- Make that the appliance has all its accessories installed, including lint filters, burner faps, racks, grease, and trousers.
- Test the gas appliance by turning on and keeping an eye on all the surface burner elements, controls, and accessories (such as a clock, timer, and setting), as well as all of the ventilation connections (make sure all burner elements are adjusted to exhibit the correct flame characteristics).
- Includes the new, code-mandated flex hose.
Please take note that all related packaging for the installed equipment will be disassembled and stored outdoors if needed.
Typical Overages
- Off-the-shelf conversion kits
- Custom woodworking to make the new item fit.
Wall Oven Installation:
- Single wall ovens will be installed by a two-person crew.
- Cut off the electric oven's power supply and unplug the device.
- Make sure the electrical cable is disconnected to avoid damaging the outlet.
- Attach the new electric oven's electrical supply.
- Make that the appliance has all of its attachments (burns caps, racks, trousers, grates, etc.) attached.
- To test a wall oven, turn it on and keep an eye on all of the burner elements on the outside, the broiler, the oven, OR the inside heating elements, all of the controls, all of the accessories (such as a clock, timer, or setting), the oven door, and the storage drawer.
Please take note that all related packaging for the installed equipment will be disassembled and stored outdoors if needed.
Typical Overages
- When a new unit is shorter than an old one, shelf build-up.
- gas to electric conversion OR vice versa (may need local gas supplier and/or electrician)
- Customer woodworking to make the new appliance fit.
BBQ Installation:
- Take the device out of the packaging and check that there are no broken or missing parts.
- Building the Barbecue Installing any add-ons like the side burner, ignitor, etc.
- After installation, go over appropriate functioning and installation with the client.
- final cleanup of the construction site
Please take note that all related packaging for the installed equipment will be disassembled and stored outdoors if needed.
Please do not hesitate to get in touch with Teletime if you do not find the service that you seek. One may choose from a broad variety of services, some of which might not be included on the list.
Related Products
Recently Viewed Products
Whirlpool WDT750SAKW
In Stock
WHIRLPOOL DISHWASHER - WDT750SAKW
- 13 Capacity (Place Settings)
- 24 inch Exterior Width
- 47 dB Decibel Level
- 5 Wash Cycles
- Fully Integrated
LG DLEX9000V
In Stock
LG ELECTRIC DRYER - DLEX9000V
- Electric
- 29 inch Width
- 9.0 cu. ft. Capacity
- 14 Dry Cycles
- 5 Temperature Settings
- Steel Drum
- Steam Clean
- Wifi Enabled