Maytag Electric Range - YMER8800FW
Model#: YMER8800FW
Overview:
Maytag YMER8800FW - MER8800FW Electric Range, 30 inch Exterior Width, Self Clean, Convection, 5 Burners, 6.4 cu. ft. Capacity, Storage Drawer, 1 Ovens, White colour True European Convection
BUY 2 ITEMS, GET $150 OFF!
BUY 3 ITEMS, GET $400 OFF!
BUY 4 ITEMS, GET $700 OFF!
BUY 5 ITEMS, GET $800 OFF!
BUY 6 OR MORE ITEMS, GET $1,000 OFF!
Automatically applied during checkout or call 1-877-374-3439 to redeem this offer today!
PRICE GUARANTEE: Buy now with 60 days price protection.
Ratings & Reviews:
Literature
Reserve & Pick Up from Showroom »
| Distribution Centres | Address | Units Available |
|---|---|---|
| Brampton | 280 Rutherford Road S, | In stock |
| Etobicoke | Etobicoke | In stock |
| Mississauga | Mississauga | In stock |
| Springdale | Springdale | In stock |
Protect your purchase with an extended warranty.
- 1 Yr EXT Major Appliance - 12 months : $89.99
- 2 Yr EXT Major Appliance - 24 months : $154.99
- 3 Yr EXT Major Appliance - 36 months : $189.99
- 4 Yr EXT Major Appliance - 48 months : $239.99
The Maytag YMER8800FW 30-Inch Wide Electric Range combines powerful performance with a sleek design, making it a standout addition to any kitchen. Boasting an impressive 6.4 cu. ft. oven capacity, this range is ready to handle everything from weeknight meals to full holiday feasts with ease, offering ample space for even your largest dishes.
One of the first things you’ll notice is its Fingerprint Resistant Stainless Steel finish, which keeps the range looking pristine and modern, free from smudges and fingerprints. This feature makes cleaning up after cooking simpler, allowing you to maintain a polished look effortlessly.
Equipped with Power Preheat, the Maytag YMER8800FW lets you start cooking in no time. This feature quickly heats the oven, so you spend less time waiting and more time enjoying your meals. The range also includes a powerful 12-inch Power™ Element, perfect for high-heat cooking techniques like searing and pan-frying, ensuring versatility for a range of culinary techniques.
True Convection with a fan and third heating element sets this range apart, as it circulates hot air throughout the oven to cook dishes evenly and consistently. And for added convenience, the Auto Convect Conversion feature automatically adjusts standard recipes to convection settings, ensuring perfect results every time.
With the Maytag YMER8800FW, available exclusively at Teletime, you’re investing in an appliance that combines cutting-edge features and high performance, designed to elevate your cooking experience to new heights.
| Certifications | |
|---|---|
| UL | UL |
| Prop 65 | Standard |
| Dimensions | |
| Carton Height | 48 3/4 |
| Gross Weight | 170 |
| Carton Width | 32 |
| Depth With Door Open 90 Degree | 47 13/16 |
| Depth Closed Excluding Handles | 25 5/16 |
| Carton Depth | 29 |
| Depth | 27 3/4 |
| Height | 47 7/8 |
| Width | 29 7/8 |
| Cutout Width | 30 |
| Capacity | |
| Capacity (cubic feet) | 6.40 |
| Connection | |
| Volts | 120/240 |
| Exterior Details | |
| Handle Material | Metal |
| Handle Type | Reach-Through Handle |
| Knob Type | Weighted-Plastic |
| Oven Window Size | Extra Large |
| Oven Control Location | Backguard |
| Details | |
| Lp Convertible | No |
| Number of Oven Racks | 3 |
| Number of Rack Guides | 7 |
| Oven Configuration | Single Oven |
| Oven Light Switch Location | Top of Console |
| Range Configuration | Freestanding |
| Range Type | Freestanding |
| CONTROLS | |
| Oven Control Type | Electronic Touch |
| Selections | Audible Signal,Control Lock,Cook Time Indicator,Delay Start,Warm Hold,Sabbath Mode,Rapid Preheat,Timer |
| General Specs | |
| Drawer Type | Storage Drawer |
| Power On Indicator Light | Yes |
| Performance | |
| Energy Rating (kWH/year) | 590 |
| Color Options | |
| Display Color | Amber |
| Feature | |
| Fuel Type | Electric |
| Oven Cleaning Type | AquaLift® Self Clean |
| Hidden Bake Element | Yes |
| Appearance | |
| Handle Color | White |
| POWER / RATINGS | |
| Amps | 40 |
| OVEN DETAILS | |
| Convection Element Type | True |
| Convection Functions | Bake,Broil,Convection Conversion,Roast |
| Number of Oven Lights | 1 |
| Oven Light Type | Incandescent |
| Door Removable | Yes |
| Natural Gas Convertible | No |
| Oven Rack Type | 2 Standard and 1 Max Capacity |
| Other | |
| Ada Compliant | No |
| Power Cord Included | Yes |
| Dimensions and Volume | |
| Cutout Height | 36 |
| Cooktop Details | |
| Cooktop Surface Color | Black |
| Cooktop Surface Material | Glass |
| Heating Element On Indicator Light | Yes |
| Hot Surface Indicator Light | Yes |
| Griddle | NA |
| Cooktop Control Type | Knobs |
| Cooktop Control Knob Color | Stainless Steel |
| Cooktop Control Knob Type | Weighted-Plastic |
| Cooktop Control Location | Backguard |
| Element/burner Details | |
| Cooktop Element Style | Smoothtop |
| Left Front Element-burner Power | 3000W/1400W |
| Left Front Element-burner Size | 12 |
| Left Front Element-burner Type | Dual |
| Left Rear Element-burner Power | 1200W |
| Left Rear Element-burner Type | Radiant |
| Number of Cooking Element-burners | 5 |
| Right Front Element-burner Power | 3200W |
| Right Front Element-burner Size | 10 |
| Right Front Element-burner Type | Radiant |
| Right Rear Element-burner Power | 1200W |
| Right Rear Element-burner Size | 6 |
| Right Rear Element-burner Type | Radiant |
| Center Rear Element-burner Power | 100W |
| Center Rear Element-burner Size | 6 |
| Center Rear Element-burner Type | Warming |
| Internal Specifications | |
| Interior Color | Grey |
Reviewed by 0 customers
Protect your purchase with an extended warranty.
- Protect your purchase for 12 months: $89.99 CAD
- Protect your purchase for 24 months: $154.99 CAD
- Protect your purchase for 36 months: $189.99 CAD
- Protect your purchase for 48 months: $239.99 CAD
Fridge Installations:
- If a whole new waterline is necessary, it is recommended that this service be obtained.
- When our delivery crew arrives, they will uncrate and transfer your new refrigerator into position if it is intended to replace the refrigerator you already have. It will not be plugged in by them.
- In the event that there is access to the floor from the ground, the installation will comprise sixty feet of waterline.
The packing will not be removed by our installer, nor will they offer carry away services. Reversing the door of the refrigerator is a service that may be provided for an additional fee.
Gas Range Installations:
- Please note that this bundle does not include any packing removal services.
- Unfortunately, haul away is not included in this service.
- Additional fees will be assessed if shut-off valves, gas permits, or any other kind of special carpentry work is required in order to accommodate the new appliance.
- If a totally new installation is required, please get in touch with us and decide for an on- site estimate. Immediately after the conclusion of the on-site inspection, our installer will offer a comprehensive estimate of the work that is necessary as well as the cost that is related with it. Each and every price associated with an on-site inspection is non- refundable and must be paid for at the TELETIME store in your immediate vicinity. Including all necessary plumbing and electrical work, as well as any other trades and permissions that are needed to support the completion of the new installation, this encompasses everything essential.
Gas Dryer with Flexible Hose Installation:
- The purchase of this service is recommended if there was a gas dryer already installed in the premises.
- If a totally new installation is required, get in touch with us and make arrangements for an on-site estimate. Immediately after the conclusion of the on-site inspection, our installer will offer a comprehensive estimate of the work that is necessary as well as the cost that is related with it. Each and every price associated with an on-site inspection is non-refundable and must be paid for at the Teletime store in your immediate vicinity.
- The packing will not be removed by our installer, nor will they offer carry away services.
- If any shut-off valves, gas permits, vent-less exhaust kits, conversion kits, vent hose, stacking of goods, expansion and reduction adapters, or special carpentry work is required in order to accommodate the new appliance, additional fees will be incurred.
White Glove Dryer Installation (only works with electric dryers):
- The delivery person will finish this task when they arrive to deliver the package.
- At the place of purchase, there will be additional fees that apply.
Washing Machines with White Glove Service:
- The delivery person will finish this task when they arrive to deliver the package.
- At the place of purchase, there will be additional fees that apply.
Dishwashers with Hoses and Haul Away Service
- The packing will be removed off the device, and our installer will pick it up and bring it to you.
- A simple installation into an already existing outlet is shown here.
- Included in this installation service is a braided fill hose made of stainless steel that is six feet long and serves as the supply line.
- The old unit will be removed by our installer, who will also dispose of all the packaging and other materials.
- Any risers, air gaps, pigtails, elbows, on/off switches, working in crawl spaces, or special carpentry work that is required to remove the previous unit may result in additional expenses being incurred.
- If a totally new installation is required, please get in touch with us and make arrangements for an on-site estimate. Immediately after the conclusion of the on-site inspection, our installer will offer a comprehensive estimate of the work that is necessary as well as the cost that is related with it.
Dishwashers with Hoses
- A simple installation into an already existing outlet is shown here.
- Before beginning the installation, you are required to remove the packing.
- If you have not ordered delivery via our installer, your unit need to be positioned near the location where it is going to be installed before our delivery workers arrive.
- Kindly detach the unit that you currently have.
- Included in this installation service is a braided fill hose made of stainless steel that is six feet long and serves as the supply line.
- If the removal of the previous unit requires the use of any risers, air gaps, pigtails, elbows, on/off switches, working in crawl spaces, or special carpentry work, additional fees will be incurred.
Ductless Range Hoods Installation
- This service does not involve the removal of packing materials or the disposal of packaging.
- If a totally new installation is required, please get in touch with us and decide for an on- site estimate. Immediately after the conclusion of the on-site inspection, our installer will offer a comprehensive estimate of the work that is necessary as well as the cost that is related with it. Each price associated with an on-site inspection is non-refundable and must be paid for at the TELETIME store in your immediate vicinity. Including all necessary plumbing and electrical work, as well as any other trades and permissions that are needed to support the completion of the new installation, this encompasses everything essential.
Ducted Range Hoods Installation:
- This service does not involve the removal of packing materials or the disposal of packaging.
- If a totally new installation is required, please get in touch with us and make arrangements for an on-site estimate. Immediately after the conclusion of the on-site inspection, our installer will offer a comprehensive estimate of the work that is necessary as well as the cost that is related with it. Each price associated with an on-site inspection is non-refundable and must be paid for at the Teletime store in your immediate vicinity. Including all necessary plumbing and electrical work, as well as any other trades and permissions that are needed to support the completion of the new installation, this encompasses everything essential.
Island Canopy or Vent Installation:
- There will be no drywall patching or painting included in this package, nor will there be any relocating of the current duct work.
- This service does not involve the removal of packing materials or the disposal of packaging.
- If a totally new installation is required, please get in touch with us and make arrangements for an on-site estimate. Immediately after the conclusion of the on-site inspection, our installer will offer a comprehensive estimate of the work that is necessary as well as the cost that is related with it. Each price associated with an on-site inspection is non-refundable and must be paid for at the Teletime store in your immediate vicinity. Including all necessary plumbing and electrical work, as well as any other trades and permissions that are needed to support the completion of the new installation, this encompasses everything essential.
Over the Range Installation:
- Before installation, remove the unit's packing and do a thorough inspection.
- Electrical service should be disconnected from the current OTR.
- Disconnect the Duct
- Install, center (if at all feasible), and secure the support bracket for the new OTR in accordance with the specifications provided by the manufacturer.
- The exhaust fan should be checked and rotated, if necessary, in order to ensure that there is enough ventilation.
- If required, connect and seal to the duct that is already in place.
- Connect the OTR cable to the receptacle and fasten it with the hardware that is supplied.
- Put in place all of the racks, panels, coverings, and/or filters that are accessory.
- The OTR should be tested by turning on and monitoring a heating cell (using a container that is filled with water), the exhaust fan, and all of the lights and accessories that are still present.
- In the event that the OTR is put inside a ductless installation, the installer will make certain that the auxiliary charcoal filter is fitted correctly.
For your information, all of the accompanying packaging of the device that was installed will be disassembled and stored in a storage facility or outdoors, depending on the circumstances.
Most Frequent Overages:
- Dedicated electrical line operating at 110 volts.
- Either converting a circular vent into a rectangular vent or the other way around
- Putting in place a box for electrical outlets if an incorrect service was offered.
- The installation of additional ductwork to facilitate the switch from perpetual exhaust to recirculating or vice versa.
- Working on the carpentry to make room for the new OTR.
Electric Cooktop Installation:
- Before installing, take out the unit's packing and give it a check.
- Place the cooktop in the opening.
- Adjust the leveling brackets to the cabinet floor to ensure that the cooktop is erect.
- Fasten the cooktop firmly to the counter.
- Glue leveling brackets to the cabinet's bottom.
- Insert the proper power cable into the cabinet.
- Attach the cooktop to the outlet and electrical box.
- Insert the cooktop power cable into the outlet. Test the cooktop by turning on all of the surface burner elements, all of the controls, and all of the accessories (such as the clock, timer, and setting).
Please take note that all related packaging for the installed equipment will be disassembled and stored outdoors if needed.
Typical Overages
- Carpentry to make the replacement appliance fit.
Gas Cooktop Installation:
- Before installing, take out the unit's packing and give it a check.
- Disconnect the gas from the appliance after turning off the gas supply at the shut-off valve and making sure the gas is off there. If there isn't a shut-off valve, there may be extra costs to turn off the gas and install a shut-off valve, but they can't go above the approved additional fee estimate that the client is given.
- Fasten the cooktop firmly to the counter.
- Glue leveling brackets to the cabinet's bottom.
- Adjust the leveling brackets to the cabinet floor to ensure that the cooktop is erect.
- Plug the cooktop power cable into an outlet and connect the cooktop to the electrical box and receptacle.
- Insert the proper power cable into the cabinet.
- Make sure the line is sealed up and leak-free.
- Attach the new gas appliance's ventilation and gas service.
- Restart the gas supply and check for leaks in all the connections.
- Check for leaks and keep an eye on the gas supply.
- Make that the appliance has all its accessories installed, including lint filters, burner faps, racks, grease, and trousers.
- Test the gas appliance by turning on and keeping an eye on all the surface burner elements, controls, and accessories (such as a clock, timer, and setting), as well as all of the ventilation connections (make sure all burner elements are adjusted to exhibit the correct flame characteristics).
- Includes the new, code-mandated flex hose.
Please take note that all related packaging for the installed equipment will be disassembled and stored outdoors if needed.
Typical Overages
- Off-the-shelf conversion kits
- Custom woodworking to make the new item fit.
Wall Oven Installation:
- Single wall ovens will be installed by a two-person crew.
- Cut off the electric oven's power supply and unplug the device.
- Make sure the electrical cable is disconnected to avoid damaging the outlet.
- Attach the new electric oven's electrical supply.
- Make that the appliance has all of its attachments (burns caps, racks, trousers, grates, etc.) attached.
- To test a wall oven, turn it on and keep an eye on all of the burner elements on the outside, the broiler, the oven, OR the inside heating elements, all of the controls, all of the accessories (such as a clock, timer, or setting), the oven door, and the storage drawer.
Please take note that all related packaging for the installed equipment will be disassembled and stored outdoors if needed.
Typical Overages
- When a new unit is shorter than an old one, shelf build-up.
- gas to electric conversion OR vice versa (may need local gas supplier and/or electrician)
- Customer woodworking to make the new appliance fit.
BBQ Installation:
- Take the device out of the packaging and check that there are no broken or missing parts.
- Building the Barbecue Installing any add-ons like the side burner, ignitor, etc.
- After installation, go over appropriate functioning and installation with the client.
- final cleanup of the construction site
Please take note that all related packaging for the installed equipment will be disassembled and stored outdoors if needed.
Please do not hesitate to get in touch with Teletime if you do not find the service that you seek. One may choose from a broad variety of services, some of which might not be included on the list.
Related Products
Recently Viewed Products
Frigidaire FFET1222UV
In Stock
FRIGIDAIRE TOP FREEZER REFRIGERATOR - FFET1222UV
- ENERGY STAR Certified
- 11.6 cu. ft. Capacity
- 24 inch Width
- 59.87 inch Height
- 2 Doors
Maytag YMER8800FW
In Stock
Maytag Electric Range - YMER8800FW
- 30 inch Exterior Width
- Self Clean
- Convection
- 5 Burners
- 6.4 cu. ft. Capacity
Ashley B3380B6
In Stock
Birmonton Queen Upholstered Panel Bed - B3380B6
- Elegant
- Durable
- Comfortable
- Stylish
- Spacious
Ashley PKG018541
In Stock
Stonemeade Sofa Chaise, Chair, and Ottoman SKU - PKG018541
- Includes sofa chaise, chair, and ottoman
- Reversible chaise cushion for flexible configuration
- Corner-blocked frame for added durability
- Attached back and loose seat cushions
- High-resiliency foam cushions wrapped in thick poly fiber
- Soft polyester upholstery with a textured weave
- Exposed feet with faux wood finish
Ashley PCB3370-31
In Stock
Fraluna Six Drawer Dresser - PCB3370-31
- Elegant
- Spacious
- Robust
- Modern
- Versatile
Ashley 2740335
In Stock
Traemore Loveseat SKU - 2740335
- Contemporary
- Comfortable
- Durable
- Elegant
- Versatile
Ashley T385-13
In Stock
Tarica Occasional Table Set (3/CN) SKU - T385-13
- Modern elegance
- Sleek design
- Glass tops
- Chrome finish
- Three-piece set